Factory Setup, Relocation & Contracting

Factory Relocation — Dismantling, Transport and Reinstallation

Electrical dismantling of existing production facilities and lines, safe transport and reinstallation at the new location.

Factory relocation is work in which every day production is down translates directly into cost. Success depends on how well the dismantling is documented: a cable loom removed without labelling turns into a puzzle that lasts weeks at the new location. Contech carries out the electrical dismantling, transport and reinstallation of production facilities and lines with documentation discipline.

Work starts with a survey stage before anything is removed. The existing plant is photographed, panel contents and cable routes are recorded, and where no drawings exist an as-built is produced. Every cable is labelled at both ends, terminal connections are photographed and panels are numbered. This documentation is the most critical phase of the move; the pace of all subsequent work is set here. During dismantling, isolation and lock-out procedures are applied and lines are taken out of service progressively. Panels are unbolted from their fixings, and sensitive cards and drives are packed separately. Cables are coiled whole wherever possible; where a cut is unavoidable, the cut point is recorded on the label. In transit, panels are protected against vibration and moisture — moisture is the most common cause of damage seen on electronic cards during long-haul moves. At the new location, installation follows the layout plan prepared before the move. Panels are positioned, cable trays are laid and connections are rebuilt from the labels. The commissioning procedure is then applied from the beginning: insulation measurement, I/O verification, safety chain testing and unloaded motor checks, before the line is brought into production progressively. Updated drawings for the relocated plant and the commissioning report are handed over.

Key Capabilities
  • Pre-dismantling survey: photography, panel contents and cable route records.
  • As-built drawings produced where the plant has none.
  • Every cable labelled at both ends; terminal connections photographed.
  • Progressive dismantling under isolation and lock-out procedures.
  • Sensitive cards and drives packed separately; protection against vibration and moisture.
  • Installation to the layout plan at the new location, reconnecting from the labels.
  • Full commissioning procedure reapplied, bringing the line into production progressively.
Where It Is Applied
  • Moving a production facility to a different industrial zone
  • Electrical dismantling and setup for factories relocated abroad
  • Changing the line layout within the same facility
  • Dismantling a second-hand production line and installing it at a new plant
Factory Relocation
Gallery
Frequently Asked Questions
How long does a relocation take?

Duration depends on the size of the plant, the number of lines and how ready the new location is. A realistic schedule is drawn up after the survey stage; we do not commit to a figure before that.

Do you handle mechanical moving too?

Electrical dismantling and installation are our scope. For mechanical dismantling and heavy transport we coordinate with specialist firms, and both are planned within the same schedule.

Will the line run as before after the move?

With a properly documented relocation, yes. Where supply quality, earthing or ambient conditions differ at the new location, these are identified during commissioning and the necessary adjustments are made.

Let's discuss your project

Tell us what you need. We will assess the site conditions together and propose a solution built for you.