Factory Setup, Relocation & Contracting

Electrical Project Approval and Contracting Works

Drafting electrical projects for industrial facilities, official approval processes and management of contracting works.

Electrical work at an industrial facility is not purely a technical matter; energy permits, design approval and acceptance processes belong to the same schedule. A run installed before approval can be rejected at acceptance and have to be redone. Contech runs the process end to end, from preparing electrical projects through submission to the relevant authorities and on to managing contracting works on site.

The process begins by setting the project scope against the facility’s needs. Load schedules, single-line diagrams, earthing designs and the required calculation reports are prepared, arranged in the format the relevant authority expects. Where an energy permit is needed, correspondence with the distribution company is handled, revision requests are answered and the approval process is followed through. For contracting work on site, the programme, material supply and crew planning are managed together. On the safety side, required permits, work plans and site rules are applied, with live working handled under a separate procedure. Once work is complete, as-built drawings are updated — every change made on site is recorded, so the file the plant holds matches reality. Measurement and test reports for acceptance are prepared and the file is handed over.

Key Capabilities
  • Preparation of load schedules, single-line diagrams, earthing design and calculation reports.
  • Documents arranged in the format required by the relevant authority.
  • Correspondence with the distribution company and revision follow-up for energy permits.
  • Management of programme, material supply and crew planning on contracting works.
  • Safety permits applied, with a separate procedure for live working.
  • As-built drawing updates — every on-site change recorded in the documentation.
  • Acceptance measurement and test reports prepared and handed to the plant.
Where It Is Applied
  • Energy permit and design approval processes at a new facility
  • Application file for a capacity increase in supply
  • Producing and updating as-built drawings at an existing plant
  • Site management of electrical contracting works
Planning, Design & Contracting
Gallery
Frequently Asked Questions
Do you follow the official approval processes yourselves?

Yes. Preparing documents, submitting them to the relevant authority, answering revision requests and following through to approval are all handled by us.

How long does approval take?

Duration depends on the authority’s workload and the scope of the project, so a guaranteed date cannot be given. Submitting complete documents in the correct format shortens the process markedly by avoiding unnecessary revision rounds.

Let's discuss your project

Tell us what you need. We will assess the site conditions together and propose a solution built for you.